MONITORING DAN EVALUASI KEUANGAN PROYEK BERBASIS IDEF0

Authors

  • Daniel Khaliq Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas Andalas
  • Akhmad Suraji Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas Andalas

DOI:

https://doi.org/10.51878/vocational.v7i1.16387

Keywords:

Monitoring dan Evaluasi Keuangan, IDEF0, Pengendalian Biaya, Proyek Konstruksi

Abstract

Financial monitoring and evaluation plays a crucial role in cost control mechanisms within the construction industry. This study aims to analyze and model the business process of project financial monitoring and evaluation using the Integration Definition for Function Modeling (IDEF0) method. A qualitative approach with a case study design was applied to Project X, executed by PT X in Padang. Primary data collection was conducted through in-depth interviews with five key informants, while secondary data were gathered from budget documents and periodic project reports. Functional analysis was systematically structured through the mapping of Input, Control, Mechanism, and Output (ICOM) components. The results demonstrate that IDEF0 modeling successfully documents financial information flows from budget planning, site expenditure verification, variance analysis, to managerial reporting in a structured manner.

ABSTRAK

Monitoring dan evaluasi keuangan memegang peranan krusial dalam mekanisme pengendalian biaya pada industri jasa konstruksi. Penelitian ini bertujuan untuk menganalisis sekaligus memodelkan proses bisnis monitoring dan evaluasi keuangan proyek menggunakan metode Integration Definition for Function Modeling (IDEF0). Pendekatan kualitatif dengan desain studi kasus diterapkan pada Proyek X yang dikerjakan oleh PT X di Padang. Pengumpulan data primer dilakukan melalui wawancara mendalam (in-depth interview) bersama lima informan kunci, sedangkan data sekunder dihimpun dari dokumen anggaran dan laporan berkala proyek. Analisis fungsi disusun secara hierarkis melalui pemetaan komponen Input, Control, Mechanism, dan Output (ICOM). Hasil penelitian membuktikan bahwa pemodelan IDEF0 mampu mendokumentasikan aliran informasi keuangan dari tahap perencanaan biaya, verifikasi pengeluaran lapangan, analisis deviasi, hingga pelaporan manajerial secara terstruktur.

 

 

Downloads

Download data is not yet available.

References

Amin, H., Malik, M., & Scheepers, H. (2024). An agency theory unpacking of how monitoring and evaluation affect international development project impact. International Journal of Project Management, 42(8), Article 102654. https://doi.org/10.1016/j.ijproman.2024.102654

Arauna, A., & Priya, A. (2020). Analisis dan perancangan dashboard monitoring pengeluaran proyek dan purchase order (PO) di PT Era Cakrawala Indonesia. Jurnal Elektronika Listrik Telekomunikasi Komputer Informatika Terapan (ELANG), 3(2), 75–80. https://doi.org/10.32664/elang.v3i2

Arkanda, R. N. F. (2025). Sistem informasi monitoring proyek konstruksi CV Hasanah Beton Indonesia dengan metode earned value management. Jurnal Ilmiah Sistem Informasi dan Ilmu Komputer (JUISIK), 5(3), 45–56. https://doi.org/10.55606/juisik.v5i3.1779

Ayu, E. S. (2022). Pengendalian biaya proyek dengan metoda analisa varian. Jurnal Rekayasa, 12(1), 1–10. https://doi.org/10.37037/jrftsp.v12i1.84

Dharmawan, R. D., Safarizki, H. A., & Firdausi, A. A. (2023). Evaluasi efektivitas keputusan addendum proyek terhadap waktu pekerjaan proyek berbasis earned value method. J@ti Undip: Jurnal Teknik Industri, 18(1), 51–61. https://doi.org/10.14710/jati.18.1.51-61

Elserougy, M., Khodeir, L. M., & Fathy, F. (2024). Practices and techniques for construction projects cost control: A critical review. HBRC Journal, 20(1), 525–552. https://doi.org/10.1080/16874048.2024.2337060

Fauzan, M. (2013). Evaluasi kemajuan proyek dengan metode nilai hasil proses pengendalian kinerja waktu dan biaya. Jurnal Teknologi Informasi Terapan (TECHSI), 5(1), 77–88. https://doi.org/10.29103/techsi.v5i1.142

Getahun, S., Ketema, R., Belachew, T., Asteray, B., Samson, D., & Ali, K. (2025). Performance evaluation of construction project by earned value management system in Amhara waterworks construction enterprise. Discover Civil Engineering, 2(1), Article 193. https://doi.org/10.1007/s44290-025-00193-0

Hikmahwati, H., & Muslimah, A. Y. (2023). The role of variance analysis as a project costs controlling tool. Jurnal Riset dan Aplikasi Akuntansi dan Manajemen, 6(2). https://doi.org/10.33795/jraam.v6i2.010

Muniroh, M. (2021). Pengendalian biaya dan waktu dengan earned value concept pada proyek penataan bangunan. Jurnal Sains dan Teknologi, 11(1), 404–410. https://doi.org/10.31959/js.v11i1.639

National Institute of Standards and Technology. (1993). Integration definition for function modeling (IDEF0) (Federal Information Processing Standards Publication 183). U.S. Department of Commerce. https://nvlpubs.nist.gov/nistpubs/Legacy/FIPS/fipspub183.pdf

Netto, J. T. (2020). Critical factors and benefits in the use of earned value management in construction. Brazilian Journal of Operations & Production Management, 17(1), 1–10. https://doi.org/10.14488/BJOPM.2020.007

Nurwana, A., Purwanto, A., & Saputra, D. (2022). Analisis perencanaan pengelolaan keuangan dalam proyek pembuatan rabat beton di Kelurahan Mappadaelo Kecamatan Tanasitolo Kabupaten Wajo. Jurnal Ilmiah Manajemen, Bisnis dan Akuntansi, 1(2), 1–17.

Plamonia, N. (2023). Analisis faktor penentu tingkat akurasi estimasi biaya proyek menggunakan analytical hierarchy process (AHP). Arsitekta: Jurnal Arsitektur dan Kota Tropis, 5(1), 45–55. https://doi.org/10.47970/arsitekta.v5i01.400

Prasetya, Y. S., Katni, D., & Nursandah, A. (2020). Perencanaan sistem informasi manajemen jadwal dan biaya dengan menggunakan metode earned value pada proses manajemen konstruksi. Agregat, 5(1). https://doi.org/10.30651/ag.v5i1.4978

Riyanto, A., & Sianturi, G. (2021). Prosedur proses layanan industri keuangan menggunakan model IDEF0. Jurnal Ilmiah Bisnis dan Ekonomi Asia (JIBEKA), 15(2), 219–230. https://doi.org/10.32812/jibeka.v15i2.219

Selfira, M. E., Mulia, D. P., Perdana, V., & Ramadhantie, T. S. (2026). Analisis varians sebagai indikator efisiensi dan kinerja anggaran: Sebuah tinjauan literatur. RIGGS: Journal of Artificial Intelligence and Digital Business, 4(4), 11293–11300. https://doi.org/10.31004/riggs.v4i4.5404

Silaen, J. R., Sobirin, M., & Siregar, S. (2026). Analisis kinerja proyek terhadap ketepatan waktu, anggaran dan pengadaaan sumber daya proyek. Academia: Jurnal Inovasi Riset Akademik, 6(2), 702–712. https://doi.org/10.51878/academia.v6i2.11417

Sunatha, I. G. N., Luh, N., Ayu, M., Pradnyadari, M., & Atama, J. W. (2022). Analisis evaluasi dan monitoring pelaksana proyek menggunakan metode tracking berbasis Microsoft Project pada proyek pekerjaan penataan kawasan Pasar Kumbasari. Jurnal Ilmiah Kurva Teknik, 11(1), 16–24. https://doi.org/10.36733/jikt.v11i1.3930

Tserng, H. P., Cho, I. C., Chen, C. H., & Liu, Y. F. (2021). Developing a risk management process for infrastructure projects using IDEF0. Sustainability, 13(12), Article 6958. https://doi.org/10.3390/su13126958

Wahyuni, W. (2021). Analisa manajemen biaya dengan metode earned value analisys pada pembangunan rumah susun Ponpes Hidayatullah Bontang. Kurva S: Jurnal Mahasiswa, 11(1), 475. http://ejurnal.untag-smd.ac.id/index.php/TEK/article/download/5320/5062

Zuhdy, A. Y., Purnamasari, R., Firdausi, N., & Alrasyidi, M. A. (2026). Dampak digitalisasi terhadap efisiensi pelaporan, inspeksi mutu, dan kontrol biaya pada proyek konstruksi di Indonesia. Teknik Sipil: Jurnal Rekayasa Sipil dan Bangunan, 31(1), 79–88. https://doi.org/10.17977/um071v31i12026p79-88

Downloads

Published

2026-11-02

How to Cite

Khaliq, D., & Suraji, A. (2026). MONITORING DAN EVALUASI KEUANGAN PROYEK BERBASIS IDEF0 . VOCATIONAL: Jurnal Inovasi Pendidikan Kejuruan , 7(1), 43–51. https://doi.org/10.51878/vocational.v7i1.16387

Issue

Section

Articles